AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Panama city airport12/16/2023 The second runway (03L/21R) is 2,682m in length and surfaced with asphalt. The first runway (03R/21L) is 3,050m in length and paved with concrete. The terminal has 34 boarding gates in total. The passenger amenities at the terminal include a bank and an ATM at the departure area, information desk and currency exchange at arrivals area and a VIP lounge near the boarding gates. The main passenger terminal features customs and immigration and baggage claim at the ground floor. The airport currently has one passenger terminal and one cargo terminal. Terminal features and runways at IATA: PTY The terminal of the airport was built at an investment of $21m. The modernisation project also included revamping the air conditioning system and renovation of cargo terminal. It expanded the size of the passenger terminal to 20,830m², replaced 14 old boarding bridges with 22 new bridges and installed modern equipment, such as new elevators, luggage conveyor belts and flight information systems at the common areas. The expansion doubled the terminal capacity to ten million passengers a year.Ī major expansion and modernisation was completed at the Tocumen airport in 2006. The project added 12 new aircraft gates, 1,400m² of commercial space and ten moving walkways, and involved the expansion of the north concourse and the baggage sorting system. The expansion at the existing north terminal (Muelle Norte) was completed in January 2012.
0 Comments
Read More
Leave a Reply. |